Taipower announced today (4/20) that the Longtan Ultra-High Voltage Substation (E/S) energy storage equipment system tender was won by the TECO team with a bid of NT$2.6 billion. ...  more
Taipower Longtan Substation 160MW Energy Storage, TECO Wins Bid for Turnkey Project |
published: 2022-04-20 9:30 |